Portfolio image
Sort by:
Home » Portfolio » Infrastructure » Roadways / Traffic » 1R Program - Group 1


Projects representative of Pare's clients and services are listed by category.  Click on a Service type or Project type in the left column.

Services / Features
  • Pedestrian Safety
  • Roadway Engineering
  • Traffic Studies
  • Construction-Phase Services
1R Program - Group 1
Cumberland, Lincoln, Burrillville, & Woonsocket , RI

Pare Corporation was selected by the Rhode Island Department of Transportation to provide engineering services for the rehabilitation of over 12 miles of various roadways.  The 1R Program is organized to allow for expansion of the project scope to include additional roads over the three-year contract.

Improvements were recently or are currently being designed for Railroad Street (Lincoln), Nate Whipple Highway (Cumberland), Old Route 102 (Burrillville), Diamond Hill Road/High Street (Cumberland), and Route 99 (Lincoln, Cumberland, Woonsocket).

Engineering services for the 1R Program include improvements to the riding surface of the roadway;
resetting frames, grates, and covers of utilities; resetting/ replacing curbing and sidewalks; safety improvements such as replacing damaged guardrail and installing new guardrail where warranted; investigating and providing ADA-compliant facilities; and investigating existing traffic control signals and upgrading equipment where necessary.

In conjunction with RIDOT’s roadway improvements to Nate Whipple Highway, the Town of Cumberland proceeded with the design of the replacement of approximately 500 feet of 16-inch water main and new valving and piping at five intersections.  Pare provided construction–phase services.