Portfolio image
Sort by:


Projects representative of Pare's clients and services are listed by category.  Click on a Service type or Project type in the left column.

Services / Features
  • GIS
  • Hydrologic & Hydraulic Evaluation
  • Outfall Inspections
  • MS4 Reporting
  • Stormwater System Mapping
  • Stormwater Management Program Plan
MS4 Compliance
Cumberland, RI

The town of Cumberland RI is required to be in compliance with the RIPDES General Permit for the US EPA Clean Water Act Municipal Separate Storm Sewer Systems (MS4) program.   Part of this compliance involves providing RIDEM with a GIS map of all outfalls, receiving waters, drainage systems, and the contributing areas to the MS4 outfalls. Pare used existing as-builts and visual observations to compile a geodatabase of all structures and GPS-located all outfalls in the town.  To do this, Pare engineers performed an in-the-field review of each stormwater structure and outfall documenting structural conditions, sedimentation, maintenance needs, and dry weather discharges.  Each outfall includes relevant information including pipe size, material, condition, and even has a photo attached to it within the map.