Merrimack Riverbank
Haverhill, MA

Pare was contracted by the City of Haverhill to stabilize the eroded bank of the Merrimack River aligned to Riverside Park.  After completing an alternatives analysis during the preliminary design phase,  Pare developed a bio-engineered solution to restore the bank by installing an armored toe combined with engineered fill stabilized with new plantings.  In addition to completing preliminary through final design, Pare’s scope of work included topographic and bathymetric survey; environmental sediment sampling, testing, and analysis; bid-phase and construction-phase services. The project was featured in the February issue of Haverhill Life; click here to download the feature.