Portfolio image
Sort by:
Home » Portfolio » Water / Wastewater » Station No. 1 WTP Upgrade Design/Build


Projects representative of Pare's clients and services are listed by category.  Click on a Service type or Project type in the left column.

Services / Features
Station No. 1 WTP Upgrade Design/Build
Newport, RI

Pare Corporation (PARE) is part of a multi-disciplinary team for the design-build of two water treatment facilities for the City of Newport. The project work incorporated dissolved airflotation treatment to address high levels of disinfection byproducts in treated water distributed in the water system.

PARE performed a variety of services at both sites. Each site had elevated levels of arsenic in soil, requiring that they be addressed through the RIDEM Office of Waste Management. PARE performed
public notice to abutters, prepared Remedial Action Work Plans for RIDEM review and approval, and oversaw the excavation and removal of contaminated soils. 

PARE’s Geotechnical Division performed subsurface explorations at both sites, consisting of advancement and logging of soil borings to identify soil conditions and depth to bedrock and groundwater. Geotechnical reports were prepared to summarize findings and provide recommendations for building foundations and site development. The findings of this evaluation were used to design an Onsite Wastewater Treatment System (OWTS) for the Lawton Valley site.